Procurement plan
Procurement is the complete process of acquiring the right goods and services under specific conditions to satisfy a requirement. In the context of designing and constructing buildings, a procurement plan is the result of a process that involves deciding what to buy, when to buy it, how, and from whom.
On a typical building project, the items that need to be procured is very long and detailed. Not properly managing this list could mean higher costs and a longer project duration. It is the responsibility of the procurement manager to manage all procurement activities that fall under the project.
The procurement plan is an important document as it establishes the procurement framework for the project and throughout the project becomes a guide (which can be amended) for procurement management.
A procurement plan can include:
- Project requirements, the project team, timelines, etc;
- Items to be procured, their justification, requirements and the contracts and procurement routes that may be adopted;
- How costs will be determined;
- Selection criteria;
- The standard procurement documentation to be used – particularly important for large projects;
- A procurement schedule, with timelines for the steps leading to contract award and fulfilment;
- Contract deliverables and deadlines;
- Specific actions needed to start and complete purchases;
- List of procurement risks, their management and mitigation;
- Long lead time items;
- Assessments of staffing requirements;
- Purchases made;
- Comparison of how the actual procurement process compares with the procurement plan, and
- Strategies to ensure bids are fair and deliver best value for the client.
A typical procurement plan will list the items required and alongside each item will be the justification (i.e the reason it is needed e.g ‘required to attach trim to fascia’ etc) and the date it is needed by. In addition to the list of items, the procurement plan may also mention those individuals who are authorised to approve purchases on behalf of the project team.
Procurement planning is important because it:
- Establishes buying requirements, timescales and available sources;
- Enables a procurement strategy to be formulated for each item in the procurement plan;
- Determines how realistic expectations are;
- Gives stakeholders the chance to discuss procurement options;
- Allows the time required to complete the procurement process to be estimated.
- Help deliver best value for the client.
[edit] Related articles on Designing Buildings Wiki
- Admeasurement.
- Construction contract
- Construction manager
- Design and build procurement route
- Design build finance and operate
- Design, build, manage contractor.
- Engineering procurement and construction contract
- Framework contract
- Management contractor
- Managing the procurement process
- OJEU procurement procedures
- Partnering in construction
- Procurement route.
- Public private partnerships PPP
- Public procurement
- Schedule of rates for construction
- Single-stage tender
- Supply contract.
- Tender processes for construction contracts
- Traditional contract for construction
- Two-stage tender
- Typical tender process for construction projects
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.